
CR152 over Stony Creek
This locally administered federal aid bridge replacement project involved the reconstruction and slight realignment of CR152 Bridge over Stony Creek at Nutting Street Road in the Town of Henderson, NY along with adjacent roadway work. The project improved the alignment for safety and improve the substandard vertical and horizontal alignment. This was done by skewing the bridge, so that the curve can be elongated, as well as raising the profile to lessen a steep grade. In addition, the new alignment was balanced along the existing right-of-way, so no acquisitions were required. This helped to keep the project on a fast-paced schedule. Foit-Albert provided environmental, survey and design.