
Old Military Road over Chubb River
Foit-Albert performed preliminary and final design services (Phases I-VI) and construction inspection for this federally-funded pass-through project. The design work included improving the roadway geometry by eliminating sub-standard features from its intersection. Additionally, this project provided a cost-effective pavement treatment for a useful service life of 20 years; improvements to various intersections alignment; replacement of the deteriorated structure over Chubb River with a new bridge that consists of pre-cast concrete box beam superstructure; concrete abutments and wingwalls; improved pedestrian access facilities along the east side of Old Military Road; improved bicycle access accommodations; and improved drainage collection system within the project limits.