SUNY Oswego Road & Site Improvements

This project involved the survey, design, and rehabilitation of Sweet Road, the main entrance into the campus, Iroquois Trail, West End Avenue, and Hewett Union Road, all of which are located on the SUNY Oswego campus. Key elements of the design included analyzing the existing conditions, designing an adequate asphalt pavement section, and designing the drainage system. Foit-Albert also provided the college with a complete set of contract documents and provided construction administration.

A second project involved engineering design and construction management support services for the repair and replacement of vehicle and pedestrian surfaces on the SUNY Oswego campus.

 

Owner:
SUNY Oswego
Project Type:
Road & Site Improvements