Construction Complete on Pontiac Road Bridge in Erie County

Foit-Albert wrapped up Construction Inspection on Erie County’s Pontiac Road Bridge which had been closed to traffic since early 2020. Foit-Albert originally designed the bridge in 2010, but due to funding, the job was put on hold. To keep it in service, it was turned into a 1-lane bridge. When funding was finally approved, Foit-Albert updated documents and the bridge is now takes traffic in both directions.